Electrical And Mechanical Connection - Obsolete TR70 Instructions De Service

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

GB
Correct purpose of use
The equipment is only authorised for proper use for its correct purpose. Failure to do this will
invalidate all warranties and release the manufacturer from all responsibility!
The equipment is constructed in compliance with IP 6 and should be protected from excessive
amounts of water and dust.
The equipment must be installed so that it is protected from external damage.
It must be ensured that the plug is correctly installed and has the relevant
IP protection.
The limits specified in the data sheet must be complied with.

3. Electrical and mechanical connection

The accepted technical regulations must be complied with during installation and dismantling.
The system component must be depressurised prior to installation and dismantling.
The special safety regulations must be complied with, particularly when working on the electri-
cal system. All connections to external electrical equipment must be made in accordance with
technical regulations.
The power to system must always be switched off when the switch is being connected.
The electrical connection is made via the plug attached to the housing.
The plug-in electrical connection must be protected in accordance with the manufacturer's
specifications.
For the assembly the following moments may not be exceeded:
G 1/8 = 1 bis 20 Nm
G 1/4 = 20 bis 2 Nm
G 1/2 = 40 bis 0 Nm
22
Betriebsanleitung / Operating manual / Instructions de service / Instrucciones de uso TR70

Publicité

Table des Matières
loading

Table des Matières