Connecting The Water Supply - Maytag MBB1952HEQ Guide D'utilisation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation

Connecting the Water Supply

(select models)
To reduce the risk of injury or death, follow
basic precautions, including the following:
• Read all instructions before installing ice maker.
• Do not attempt installation if instructions are not
understood or if they are beyond personal skill
level.
• Observe all local codes and ordinances.
• Do not service ice maker unless specifically
recommended in Use & Care Guide or published
user-repair instructions.
• Disconnect power to refrigerator before installing
ice maker.
• Water damage due to an improper water
connection may cause mold/mildew growth.
Clean up spills or leakage immediately.
To avoid property damage or possible injury,
follow basic precautions, including the
following:
• Consult a plumber to connect
tubing to household plumbing to assure
compliance with local codes and ordinances.
• Confirm water pressure to water valve is between
35 and 100 pounds per square inch. 20 pounds
per square inch if there is not a water filter.
• Do not use a self-piercing, or
Both reduce water flow and can become clogged
over time, and may cause leaks if repair is
attempted.
• Tighten nuts by hand to prevent cross threading.
Finish tightening nuts with pliers and wrenches.
Do not over-tighten.
• Wait 2-3 hours before placing refrigerator into final
position to check and correct any water leaks.
Recheck for leaks after 24 hours.
• Verify the copper tubing under the sleeve is
smooth and free from defects. Do not reuse an
old sleeve.
9
WARNING
CAUTION
1
" O.D. copper
4
3
" saddle valve.
16
Materials Needed:
" outer diameter flexible copper tubing
1
4
• Shut-off valve (requires a
water supply line before valve attachment)
• Adjustable wrench (2)
1
" hex nut driver
4
Notes:
• Use copper tubing only for installation. Plastic is
less durable and can cause damage.
• Add 8' to tubing length needed to reach water
supply for creation of service loop.
1. Create service loop with
copper tubing (minimum 2'
diameter). Avoid kinks in the
copper tubing when
bending the service loop. Do
not use plastic tubing.
2. Remove plastic cap from water valve
inlet port.
3. Place brass nut (A) and sleeve (B)
on copper tube end as illustrated.
Reminder: Do not use an old
sleeve. The nut and sleeve are
provided in the Use and Care
packet.
4. Place end of copper tubing into
water valve inlet port. Shape
tubing slightly. Do not kink – so
that tubing feeds straight into inlet
port.
1
" hole to be drilled into
4
2' diameter
minimum
B
A
B
A

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mbb1952hew12828151

Table des Matières