Dimensions; Tools Required For Installation - CHIEF CPA330 Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions

DIMENSIONS

TOOLS REQUIRED FOR INSTALLATION

7/32" (wood studs)
3/8" (concrete-UX10 anchors)
5/16" (concrete-AF8 anchors)
HARDWARE REQUIRED (NOT INCLUDED)--Dependent on installation method
1.
Install to wood ceiling joists
5/16" x 2-3/4" (minimum length) lag screws (Qty. 4)
2.
Install to threaded rod
3/8" ASTM A307 threaded rods, 16 threads/square
inch (Qty. 4)
3/8" channel nuts (Qty. 4)
3/8" jam nuts (Qty. 8)
3/8" washers (Qty. 8)
PARTS
1/2"
nut driver
A (1)
(CPA330
Ceiling Plate)
E (1)
5/16 x 1/2"
3.95
100.2
5/32"
(included)
3.
Install to solid concrete
UX10 or AF8 anchors (Qty. 4)
5/16" flat washers (Qty. 4)
5/16" x 2-3/4" bolts (Qty. 4)
Hardware bag
C (4)
5/16"
B (4)
5/16-18 x 1"
F (1)
5/32"
CPA330
DIMENSIONS:
INCHES
[MILLIMETERS]
1/2"
D (4)
5/16"
3

Publicité

Table des Matières
loading

Table des Matières