k) Gear box cover, chassis bridge
S7
M3 x 15mm
S2
S1
S4
S1
M3 x 10mm
CB1
S1
EH1
GA1
AN1
S2
HA2
HA1
First, the two short retaining pins "HA1" and the long retaining
pin "HA2" are installed on the chassis using countersunk
tapping screws. If necessary, use flat nose pliers to tighten
the retaining pin.
HA1
HA1
Now the chassis bridge "CB1" can be installed.
The two screws "S4" (M3x10 mm) are screwed to the brackets
of the steering arms.
The two screws "S7" (M3x15) are screwed to the metal motor
holder through the chassis bridge and the gear box cover.
HA2
Two long tapping screws "S2" (thread length 15mm) each are
screwed into the differential casings from the front and the
EH1
back.
Use the tapping screws "S1" (thread length 10 mm) to screw
the retaining pins and the receiver holder "EH1" to the chassis
bridge "CB1". The installation of the chassis bridge is now
complete.
Note: The aerial tube holder "AN1" is installed above the
chassis bridge "CB1".
64