Mettler Toledo IND780 Guide D'installation page 40

Masquer les pouces Voir aussi pour IND780:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

IND780 Terminal Division 2 and Zone 2/22 Installation Manual
2. Before connecting the wires, pass the cable through an appropriately sized
cable gland and into the enclosure, as shown in Figure 2-20.
Figure 2-20: Cable Inserted Through Nut and Cable Gland
3. A metal cable gland is used with the Analog Load Cell, IDNet , PDX, and
POWERCELL options. To further protect the IND780 from external influences,
the cable's shield wire can be spread out and pressed into cable gland by the
grommet, as shown in Figure 2-21.
Figure 2-21: Installing Metal Cable Gland with Shield Wire
4. Move the cable through the gland and grip to adjust its length within the
enclosure. When making cable terminations inside the harsh enclosure,
ensure that the cable length from the terminal strip/connector to the terminal
housing is sufficient so that no strain is placed on the connector assembly
when the housing is in the fully open position.
2-25

Publicité

Table des Matières
loading

Table des Matières