C1448, C1848, C2148W
Air and Water Cooled User Manual
Adjustments
Bridge Thickness - For Service Tech Only
1
Push and hold Off till the machine stops.
2
Remove evaporator cover.
3
Remove curtain.
4
Use a box wrench and rotate the bridge
thickness adjustment screw in 1/8 turn
increments CW to increase bridge thickness.
Rotate CCW to decrease bridge thickness.
Caution: Do not make the bridge too thin or the
machine will not harvest properly. Bridge thickness
adjustments are not covered by warranty.
5
Return curtain to its normal position.
6
Push and release the On button. Check next
harvest of ice. Repeat steps 1-6 if needed.
Note: Water cooled models, the refrigeration
system discharge pressure is factory set at 245
PSIG, which should yield a freeze cycle discharge
water temperature of about 105-110 degrees F.
Adjust if necessary.
3 -4 mm
bridge
Too Big
Just Right for
Small Cube
Ice Bridge Thickness Measurement
November 2006
Page 10
Just Right for
Medium Cube
Ice Thickness Sensor
Too Small