2
[Fig. 2.0.1]
3
[Fig. 3.2.1]
A
B
400
*1
A
[Fig. 3.2.2]
B
F
E
G
H
4
[Fig. 4.1.1]
E
E
C
A
D
B
5
[Fig. 5.1.1]
B
2
B
PEH-P500:1940
B
PEH-P400:1637
C
D
200
PEH-P500:1890
PEH-P400:1587
PEH-P500:2490
1
PEH-P400:2187
2
3
PEH-P20:2043
PEH-P16:1740
PEH-P20:1940
PEH-P16:1637
25
C
B
A Ceiling board
B Edge beam
C Tie beam
D Square timber for hanging the air conditioner
E Pitch
A
A Unit body
B Lifting machine
A
B
A Air outlet
B Remote controller
3.2
1 When connecting air inlet
2 When installing the suspension fixtures prior to installation of the
indoor unit without inlet duct
3 When hanging the indoor unit directly without inlet duct
A Service space
B Suspension bolt pitch
C Air inlet
D Air outlet
*1 When there is no 500mm of service space on top of the unit, there must be
700mm of service space at the air outlet side.
E Top of the unit
F 4-ø12 suspension bolt holes
G Control box
H Main body
4.1
[Fig. 4.1.2]
F
G
5.1
[Fig. 5.1.2]
A
B
A
H
F Insert: 100 to 150 kg (1 piece) (field supply)
G M10 hanging bolt (field supply)
H Reinforcement
A
B
A
Ceiling
A Nut
B Washer