DAB esybox max 85/120 Instructions Pour L'installation page 44

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 73
3.
Open the caps with the appropriate key provided and
store them in the technical compartment.
With the grease provided, lubricate the O-Ring seals
on the delivery and suction manifolds.
Lower the pump onto the Esydock base, centring the
fixing pins.
4.
Fix the pump to the dock base with the wrench
supplied. To ensure that it is properly fixed, check
that the green ring of the centring pins is visible.
After use, put the key away on the pump hooks. If
the wrench gets lost or broken, it can be easily
replaced with a 10mm (13/32 inch) socket wrench).
ENGLISH
42
Figure 5
Figure 6

Publicité

Table des Matières
loading

Table des Matières