16.3 Installation diagram
300*
200*
100*
TWw
EZ
A
16.4 Water connection
The machine and any other relevant additional devices must be connected in accordance with local stand-
ards and regulations.
Inlet water connection (G ¾", external thread)
Location
Water quality
Inlet water temperature
Water hardness
Minimum flow pressure
Maximum inlet pressure
(back pressure)
Flow rate
Waste water connection
Location
Construction
300*
200*
100*
TWw
EZ
A
approx. 400 mm above finished floor
Beside the machine
The microbiological aspects of fresh water must have the same quality as that of drink-
ing water
Standard
PTD 701 AE RO,
PTD 702 AE RO
Standard
PTD 701 AE RO,
PTD 702 AE RO
Standard
PTD 701 AE RO,
PTD 702 AE RO
600 kPa (6.0 bar)
Standard
PTD 701 AE RO,
PTD 702 AE RO
max. 600 mm above finished floor
Beside the machine
Trap on-site
IMPORTANT
Provide the connections next to the machine on
the left or the right.
Define the precise dimensions taking the local
circumstances into account.
EZ
Electrical connection
A
Waste water connection
TWw
Inlet water connection
max. 60 °C
max. 35 °C
Machines without
integrated softener
3 °dH (3.8 °e /
5.34°TH / 0.54 mmol/l)
Recommended, so that the
machine does not calcify.
35 °dH (43.9 °e; 62.3 °TH;
6.3 mmol/l)
100 kPa (1.0 bar)
140 kPa (1.4 bar)
at least 4 l/min
at least 4 l/min
Connecting the machine
Machines with
integrated softener
31 °dH (37.6 °e /
53.4°TH / 5.35 mmol/l)
—
75