4
x8
DRYWALL CLOISON SÈCHE MURO SECO
a
STUDS MONTANTS MONTANTES
b
CONCRETE BÉTON CONCRETO
c
Install Hang Track
Determine wall type and install hang track following the
instructions as specified below:
a. Drywall:
1. Drill 1/2 in. holes at marked locations on wall.
2. Remove toggle from bolt. Insert bolt through hole
in hang track and re-install toggle onto end of bolt.
Repeat for all toggles and bolts (supplied).
3. Place hang track against wall at hole locations.
Squeeze toggle bolts and push through drilled
holes. Tighten bolts to secure hang track to wall.
b. Studs:
1. Attach hang track directly to studs in wall
using #12 x 2 in. panhead screws (supplied).
2. Secure remaining holes with toggles and bolts
(supplied).
c. Concrete:
1. Drill 1/4 in. holes at marked locations on wall.
2. Insert anchors into all 1/4 in. holes.
3. Place hang track against wall aligning holes in
track with anchors.
4. Secure hang track to wall with #12 x 2 in.
panhead screws (supplied).
or
ou
x8
o
Installation du
Rail Horizontal
Déterminer quel est le type de mur et installer le rail
horizontal en suivant les directives ci-dessous :
a. Cloison sèche :
1. Percer des trous de 1,2 cm aux endroits marqués sur le
mur.
2. Retirer les ailettes du boulon. Insérer le boulon dans
le trou du rail horizontal et réinstaller les ailettes à
l'extrémité du boulon. Répéter l'opération avec tous les
boulons à ailettes (fournis).
3. Placer le rail horizontal contre le mur vis-à-vis les trous.
Comprimer les boulons à ailettes et pousser dans les
trous de perceuse. Resserrer les boulons pour fixer le
rail horizontal au mur.
b. Montants :
1. Fixer le rail de suspension directement aux
montants du mur, à l'aide de vis à tête cylindrique
bombée no 12 x 5 cm (fournies).
2. Ancrer à partir des autres trous à l'aide de boulons à
ailettes (fournis).
c. Béton :
1. Percer des trous de 6 mm aux endroits marqués
sur le mur.
2. Insérer les chevilles d'ancrage dans les tous trous de
6 mm.
3. Placer le rail horizontal contre le mur en alignant les
trous du rail aux chevilles d'ancrage.
4. Fixer solidement le rail horizontal au mur à l'aide de
vis à tête cylindrique bombée n
x8
IMPORTANT: For all wall types, secure hang track to wall through ALL hole
locations. For optimum performance, align holes 1 and 3 OR 2 and 4 (count-
ing from either end) with studs and secure with screws. For remaining holes,
use toggles and bolts.
IMPORTANT : Pour tous les types de murs, fixer le rail horizontal au mur en
utilisant TOUTES les marques de trous. Pour de meilleurs résultats, aligner
les trous 1 et 3 OU 2 et 4 (en comptant à partir d'une extrémité ou l'autre)
avec les montants et fixer à l'aide de vis. Utiliser des boulons à ailettes pour
les autres trous.
IMPORTANTE: Para todos los tipos de pared, fije el riel horizontal a la
pared por TODAS las ubicaciones de los agujeros. Para un rendimiento
óptimo, alinee los agujeros 1 y 3 Ó 2 y 4 (contando desde cada extremo) con
los montantes y fíjelos con los tornillos. Para los agujeros restantes, use los
pernos de palanca.
o
12 x 5 cm (fournies).
4
1/2 in. (1,2 cm)
1/4 in. ( 6 mm)
Instalación del
Riel Horizontal
Determine el tipo de pared e instale el riel horizontal
conforme a las instrucciones a continuación:
a. Muro seco:
1. Perfore agujeros de 1,2 cm en las ubicaciones
marcadas en la pared.
2. Quite la palanca del perno. Inserte el perno a través del
orificio en el riel horizontal y vuelva a instalar la palanca
en el extremo del perno. Repita el proceso para todos
los pernos de palanca (incluidos).
3. Coloque el riel horizontal contra la pared en las
ubicaciones de los agujeros. Presione las palancas
de los pernos y empújelos a través de los agujeros
perforados. Apriete los pernos para fijar el riel
horizontal a la pared.
b. Montantes:
1. Coloque el riel horizontal directamente a los
montantes en la pared usando los tornillos de cabeza
redonda #12 x 5 cm (incluidos).
2. Fije los agujeros restantes con los pernos de
palanca (incluidos).
c. Concreto:
1. Perfore agujeros de 6 mm en las ubicaciones
marcadas en la pared.
2. Inserte los tarugos en todos los agujeros de 6 mm.
3. Coloque el riel horizontal contra la pared alineando los
agujeros en el riel con los tarugos.
4. Fije el riel horizontal a la pared con tornillos de
cabeza redonda #12 x 5 cm (incluidos).