ASSEMBLY STEp 1
HARdWARE bAG 1 CONTENTS :
BOLT (A)
SPRING WASHER (B)
20 mm
15 mm
Qty: 4
Qty: 4
RUNNING DECK
LEFT
CONSOLE
MAST
BASE FRAME
FOOT LATCH
FLAT WASHERS (C)
SPRING WASHERS (B)
BOLTS (A)
10
632T_OM_rev1_2.indd 10-11
A
Cut the yellow banding straps and lift the
running deck upward until the foot
latch locks. Remove all contents from
FLAT WASHER (C)
underneath the running deck.
15 mm
Qty: 4
Open hardware bag 1.
B
With the running deck in the raised
C
position, attach the left console mast
to the base frame using 4 bolts (a),
4 spring washers (b) and 4 flat
washers (c).
NOTE: Do not completely tighten any
step 4
screws or bolts until
is complete!
ASSEMBLY STEp 2
HARdWARE bAG 2 CONTENTS :
BOLT (A)
SPRING WASHER (B)
FLAT WASHER (C)
20 mm
15 mm
15 mm
Qty: 4
Qty: 4
Qty: 4
LEAD WIRE
CONSOLE
CABLE
RUNNING DECK
SPRING WASHERS (B)
FLAT WASHERS (C)
BASE FRAME
Open hardware bag 2.
A
Pull lead wire through right console
B
mast. After pulling the lead wire through the
mast, the top of the console cable should
be located at the top of the mast. Detach and
discard the lead wire.
C
With the running deck in the raised
position, attach the right console
mast to the base frame using 4 bolts
(a), 4 spring washers (b) and 4 flat
washers (c).
RIGHT
CONSOLE
MAST
NOTE: Do not completely tighten any
step 4
screws or bolts until
is complete!
NOTE: Be careful not to pinch any wires
while assembling the right console mast.
BOLTS (A)
11
4/25/11 3:44 PM