Assembly Preparation - Häfele 271.91.114 Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

GB
Fig. 3
Fig. 4
Fig. 5
Fig. 6
Ø10,5 mm
Ø13 mm
90°

Assembly preparation

Check delivered goods.
Fig. 3
Use the drilling template to mark the six holes to be drilled on the inside of
the left and right side walls.
Fig. 4
Drill holes with 9 mm diameter through each side
wall and countersink slightly from outside with
12 mm diameter.
Fig. 5
Affix each of the two retainer brackets with two
countersunk-head screws M8 x 30 mm.
Rückwand
Rear panel
50 mm
90 mm
Ø10 mm
240 mm
40 mm
Fig. 6
With double beds, drill through the
lower base of the cabinet as shown
in diagram on the left and
min.
420 - 600
countersink slightly from below with
mm
13 mm diameter.
Ø9 mm
Ø12 mm
90°
19 - 22 mm
15/40

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

271.91.115271.91.145271.91.146271.91.135271.91.136

Table des Matières