T&S ROTOFLEX B-2370 Instructions D'installation Et D'entretien page 6

Table des Matières

Publicité

General Instructions
8. Apply a thin coat of #111 grease to no.16 and
slide onto the top end of no.2. Slide no.17 over
no.16 and secure with no.18.
Lower End - Riser Assembly Repair
9. Slide no.12 onto no.2, flanged end first.
10. Slide no.13 onto no.2 and over end of no.12 in
step 9. Slide the other no.12 onto no.2, small O.D.
first.
11. Slide no.10 into no.8. Apply #111 grease to
no.11 and slide it into the end of no.8.
12. Apply thin coat of #111 grease to no.9 and slide
onto no.8. Slide this assembly onto no.2.
13. Slide no.5 onto no.2, then slide on no.6. Slide
another no.5 onto no.2.
14. Slide no.3 on no.2 and lightly tighten set
screws.
15. Reassemble no.2 assembly to base faucet.
16. Slide no.19 on upper arm over valve end of
no.2 (in "Upper Arm Repair" section). Light
pressure is required to start threads of no.20 into
no.19. Tighten firmly.
17. Remove all gaps between no.3 and no.19.
Tighten no.3 screws evenly and firmly.
18. Apply no.4 to no.3.
19. Align the two holes in no.28 with the holes in
no.6 and reassemble the two using no.7.
20. Tighten no.36 on B-0109 Wall Bracket.
Knuckle Rebuild Kit - 010189-45
For servicing just no.23 and no.24, follow steps
4-7 in the "Rebuild Kit - Upper Arm Repair"
section on page 5.
21, 23, 24
20
19
28
18
17
16
15
5
14
12
13
12
11
10
9
8
5
6
7
5
4
3
2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rotoflex b-2371

Table des Matières