Panasonic TY-VK55LV2 Manuel D'installation page 33

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. Mounting multiple units
① Insert the pins into the holes in the
adjacent installation mount.
② Fasten the adjacent frames together
using the frame linking screws Ⓒ,
spring washers, fl at washers and nuts.
(Tightening torque: 3.5 to 4.5 N·m)
③ Now repeat ① and ② to interlink the other
units.
* When mounting multiple units, see below
for the order in which the units should be
mounted.
④ If necessary, fasten to the mount surfaces
of the respective installation mounts.
Ⓒ Frame linking screws,
spring washers and fl at washers
nuts
Example of order for mounting multiple units: When interlinking 6 units
① Mount the unit that will serve as the base position (
② Successively mount the units in a row to the right of the base position unit (
③ Mount the unit above the base position unit (
④ Successively mount the units in the row to the right of unit
4
   
Base position
1
Pins
1
).
4
).
5
6
2
3
2
and
4
(
5
and
6
).
3
).
33

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Ty-vk49lv2

Table des Matières