Motorized valve and control
Motorized thermo-electric valve assembly and components
(See fig. 28).
Mod. 42GW...B
Ref.
Description
a
Actuator
Valve 1"gas pre-assembled
b
Valve 3/4" gas pre-assembled
Valve 1/2" gas pre-assembled
c
Shell
d
Clips
e
Cable holder
f
Gasket
Instructions for mounting of motorized thermo-
electric valve assembly
The thermo-electric valve must be mounted on the unit after the unit
installation. For this operation follow figures, depending on model.
Assembly (Fig. 30)
For models 42GWD (4-pipe), the valve assembly for the cold
water coil must be installed first.
Connect the valve assemble to the coil and
Insulate the valve assembly.
Gasket type
Rubber
Fibre
Fit the actuator on the valve body, route the cable through the grommet
ref. "e" and fix them to the casing using the assembled screw.
To connect the steel pipes to the system, ensure they are aligned and
supported to avoid excess strain on the unit. If the system is filled
with water, check all fitting seals.
After ending the hydraulic connections, make sure there are no leaks.
Insulate the valve using the shell, fix it by means of the clips and make
sure that all cold parts are insulated (fig. 29 – 30).
For 4-pipe hot water coil, repeat all the operations with gas adaptors,
as per the table.
NotE:
the seal efficiency of the valve assembly is factory tested. Any
system losses are therefore due to an incorrect installation.
operation of the thermo-electric valve (See fig. 31)
This 2- 3-way valve is of the OPEN/CLOSE type with very slow travel.
It is not a modulating valve so it has no PTC.This valve is driven, as a
sensible element, by the ambient thermostat of the "cassette" unit.
26
42 GW...B
004
012
004
020
008
016
008
010
020
010
2-pipe
4-pipe
q.ty
q.ty
q.ty
q.ty
1
1
2
1
1
1
1
1
1
1
3
3
3
1
1
1
2
2
4
(see "Components" table)
fix it by a 30Nm torque.
Nm
10/12
25/30
The 2-way valve is normally closed to the coil with no powered
actuator side. The 3-way valve is normally closed to the coil with no
powered actuator side while is open to the bypass way side. When the
room temperature does not satisfy the thermostat, the valve opens
after about 3 minutes about to allow water to circulate in the coil.
If the room temperature satisfies the thermostat or if the electric
power has been switched off, the valve is closed after about 3 minutes
towards the coil and is opened towards the bypass.
If an emergency occurs, the valve may be manually opened, removing
the electric head, unscrewing the ring nut.
2
When the emergency ends, remember to reset the valve to
1
automatic operation, repositioning the electric head; failure to
1
do this can result in condensate formation due the water pipes,
even if the unit is switched off.
1
3
Instructions for field supplied valves
1
4
Water connection
Install valves following manufacturer's instructions; refer to the
relevant figures for connection to the unit.
Carefully insulate pipes, valve assemblies and coil connections (cold
water side) to avoid condensation forming on the pipes and dripping
on the false ceiling.
Electrical wiring
Connect the room control following instructions for the control used.
WARNING:
Pass cables through the control panel cable-conduit.
Connect the valves according to the instructions and the wiring
diagrams attached to the machine documents.
Valves, closing the unit water inlet when there is no power
supply, must be used.
oN-oFF valves (230V)
The chilled water valve must be operated by the 230V on-off signal
from terminal 1 of TB3 and the hot water valve from terminal 2 of TB3.
If these connections are not made as described the drain pan
condensate may overflow.
Valves should open only when the fan is working, that is, when one of
terminals V1, V2, V3 is energized by L mains supply.
The optional electric heater (mod. 42GWE) which can only be factory
installed, must only be energized when the fan is working.
The electric heater (if any) is operated only if a 230 V voltage is
supplied to terminals 2 and 4 of the electronic board.
NotE: When the system is filled with water, verify all couplings
for tightness.
the manufacturer does not accept responsibility for the tightness
of the field - installed valve assembly and this is not tested in the
factory.
He declines any responsibility for non functioning of these
assemblies and for damage due to dripping.