Cooper Lighting Solutions Metalux CBRK CooperKit Instructions D'installation page 5

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Notice
Do not touch the LEDs with hands or tooling! Touching
LEDs can lead to failure of the product.
8.
Push LED panel upward into position so that the tabs
sits above the side panels (this may require a push up
on the tabs while pushing outward on the side panels).
Fixate panels and establish ground by turning each
fastener 90 degrees.
ATTENTION
ESD SENSITIVE
90
Figure 8.
Installation Troffer Label (C) :
9.
Place Troffer Label (C) inside original troffer.
Figure 9.
THIS LUMINAIRE HAS BEEN
MODIFIED FROM ITS ORIGINAL
CONFIGURATION. THIS LUMINAIRE
WILL NO LONGER ACCEPT THE
ORIGINAL LAMPS STATED ON THE
RELAMP LABEL.
Installation Instructions – LED Retrofit Kit – CBRK CooperKit
O
THIS LUMINAIRE HAS BEEN
MODIFIED FROM ITS ORIGINAL
CONFIGURATION. THIS LUMINAIRE
WILL NO LONGER ACCEPT THE
ORIGINAL LAMPS STATED ON THE
RELAMP LABEL.
Notice
It is imperative to use the retrofit warning sticker included
with the product in order to alert the end user that
this luminaire will no longer operate on the originally
intended lamps.
Make new electrical connections to supply voltage by
employing applicable connectors in accordance with the
applicable federal, state and local laws, regulations and
electrical codes.
Ground connection (Situation 1 - 2) :
10a. Situation 1 Grounding: Screw grounding cable from
LED Panel (B) to original troffer if existing fixture
ground connection is made trough existing fixture.
Ground
C
B B
Figure 10a.
10b. Situation 2 Grounding: Connect to the incoming
ground lead from conduit.
B
Figure 10b.
COOPER LIGHTING SOLUTIONS
Ground
Ground
Ground
IB519143EN
Installation instructions
5

Publicité

Table des Matières
loading

Table des Matières