Maintenance - resideo BraukmannSG160S Instructions D'installation

Vanne de sécurité
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5.
Loosen slotted screw
• Do not remove slotted screw
6.
Slacken tension in compression spring
• Turn adjustment handle counter clockwise (-) until
it does not move any more
7.
Slowly open shut-off valve on inlet
8.
Turn adjuster knob until the manometer shows the
desired value
9.
Retighten slotted screw
10.
Slowly open shut-off valve on outlet
6

Maintenance

In order to comply with EN 806-5, water fixtures must
be inspected and serviced on an annual basis.
As all maintenance work must be carried out by an
installation company, it is recommended that a
servicing contract should be taken out.
In accordance with EN 806-5, the following measures must
be taken:
6.1 Inspection
6.1.1 Pressure reducing valve
1.
Close shut-off valve on outlet
2.
Check outlet pressure using a pressure meter when
there is zero through-flow
• If the pressure is increasing slowly, the valve may
be dirty or defective. In this instance, carry out
servicing and cleaning (See 6.2 Maintenance)
3.
Slowly open shut-off valve on outlet
6.1.2 Check valve
1.
Close shut-off valve on inlet
2.
Remove test cockcovers of check valve
3.
If not watertight, close shut-off valve on outlet
4.
Unscrew sealing plug
5.
Remove and exchange check valve
6.
Mount sealing plug
• Check thread
7.
Reassemble in reverse order
8.
Slowly open shut-off valves on inlet and outlet
6.1.3 Safety valve
Frequency: every 6 month
1.
Actuate lifting device
2.
Release lifting device
Shut-off valve closes
available water flows completely off
Malfunction:
1.
Actuate lifting device multiple times, if necessary
initiate repairs
GB
6.2 Maintenance
Do not use any cleansers that contain solvents and/or
alcohol for cleaning the plastic parts, because this can
cause damage to the plastic components - water
damage could result.
Detergents must not be allowed to enter the
environment or the sewerage system!
6.2.1 Pressure reducing valve
1.
Close shut-off valve on inlet
2.
Release pressure on outlet side (e.g. through water
tap)
3.
Close shut-off valve on outlet
4.
Loosen slotted screw
• Do not remove slotted screw
CAUTION!
There is a spring in the spring bonnet. It may cause
injuries if the spring is derailing.
• Make sure tension in compression spring is
slackened!
5.
Slacken tension in compression spring
• Turn adjustment handle counter clockwise (-) until
it does not move any more
6.
Unscrew spring bonnet
• Use double ring wrench ZR06K
7.
Remove slip ring
8.
Remove valve insert with a pair of pliers
9.
Unscrew filter bowl
• Use double ring wrench ZR06K
10.
Remove slotted ring
11.
Check that sealing ring, edge of nozzle and slotted
ring are in good condition, and if necessary replace
the entire valve insert
12.
Remove filter, clean and reinsert
13.
Place O-ring onto filter bowl
14.
Reassemble in reverse order
Press in diaphragm with finger before inserting slip
ring
Screw in filter cup hand-tight (up to max. 18Nm)
15.
Set outlet pressure and adjust setting scale
16.
Slowly open shut-off valve on inlet
17.
Slowly open shut-off valve on outlet
6.2.2 Check valve
1.
Close shut-off valve on inlet
2.
Release pressure on outlet side (e.g. through water
tap)
3.
Close shut-off valve on outlet
4.
Unscrew sealing plug
5.
Remove and exchange check valve
6.
Mount sealing plug
• Check thread
4
MU1H-1346GE23 R0420

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sg160sd

Table des Matières