Installation Instructions - Continua SQ4 Suspended LED
4
Joining
Ensure all tabs are bent upward for joining and
making electrical connections. Close all tabs once
complete. Slide next fixture onto hanging fixture until
biscuit joiners engage. Make wiring connections and
push wires into housing prior to sliding the fixtures
firmly together. Once fixtures are together fasten
joiners using the provided #8-18 x 5/8 HWH screws.
5
Cooper Lighting Solutions
C
2X
Installation instructions
5
Roll Lens
IMPORTANT: If conditions are dusty/dirty, recommended
practice is to keep lens roll(s) in plastic packaging and
install once conditions are clean. Install roll lens using
clean work gloves.
IMPORTANT: Energize fixture to test LEDs and confirm
they are all lit before beginning Roll Lens install.
Support the roll lens at one end of fixture (as shown)
while another person pulls lens through.
Perceive Lens Option
IMPORTANT: Ends of lenses should overhang
fixture by ¼" at each end. Trim lens where
necessary. DO NOT UNDER-CUT.
6
Optional Baffle
Remove tape after installation is
complete
Remove Baffle Tape after fixtures are installed.After
removing tape, take care to ensure that the down-light
baffle components are spaced appropriately so that
there is minimal gap between them.
"Install lens with textured side facing in
direction shown on lens label.
0.25"
Baffle Option
5