7
[Fig. 7.2.1]
8
[Fig. 8.1.1]
[Fig. 8.1.2]
A
B
A
D
E
9
[Fig. 9.0.1]
A
[Fig. 9.0.2]
B
A
C
8.1
A Cut here
B Remove brazed cap
C
A Thermal insulation
B Pull out insulation
C Wrap with damp cloth
D Return to original position
E Ensure that there is no gap here
F Wrap with insulating tape
F
300
G
C
200*
H
A
≥150mm
D
7.2
A Refrigerant pipe (liquid pipe)
B Refrigerant pipe (gas pipe)
C Drain pipe
113
148
[Fig. 8.2.1]
50*
350*
100
F
E
D
B
100
E
B
C
8.2
A
B
1
C
C
E
D
A Downward slope 1/100 or more
B Connection dia. VP-20 (O.D. 26 mm)
C Indoor unit
D Collective piping
E Maximize this length to approx. 10 cm
A Air inlet
B Air outlet
C Access door
D Ceiling surface
E Duct
F Duct box
G Air filter
H Inlet grille
* Reference data
A Aluminum tape
B Glass-wool duct
C Dew condensation proof material
D Indoor unit body
C
2
3