Tools Required - Cooper Lighting Solutions Prevail Instructions D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Installation Instructions – Prevail / USSL
INSTALLATION
This lighting fixture has been shipped complete with one
of several mounting options. Please follow the installation
instructions specific to the catalog part that you ordered.
N
ote:
Care must be taken not to set lighting fixture down
on optical lenses or lift the fixture by the lens.

Tools Required

Ratchet, 3/4" socket, 3/4" wrench, #2 Phillips head screw
driver and torque wrench.
Pole Mount Arm (Figure 1. - Figure 5.)
1.
Pole mounting arm is designed for a square or round
pole. Round pole installation will require the mounting
arm break away tabs to be removed. Grab break away
tab with pliers and break-away the tab. (Figure 1.)
2.
Mount the arm to the round or square pole using the
provided 1/2" x 1-3/4" long bolts and nuts as shown.
Torque bolts to 40 foot-lbs. (55 N-M). (Figure 2.)
3.
Fold fixtures wires tightly towards fixture door when
sliding fixture on to mounting arm. Tighten the center
phillips head screw to 20 in-lbs. (2.3 N-M). (Figure 3.)
4.
Make wire connections inside the mounting arm. Refer
to wire diagram for power connections. Connect the
supply wires to appropriate luminaire leads: (Figure 4.)
• Supply side ground wire to green luminaire lead.
• Supply side neutral wire to white luminaire lead.
• Supply side line voltage wire to black luminaire lead.
5.
Install arm cover and tighten phillips head screws to 20
in-lbs. (2.3 N-M).
Ensure the luminaire supply leads do not get pinched
N
ote:
between cover and mounting arm. (Figure 5.)
6.
Install pole cap after completion of luminaire installation
and wiring.
For Round Pole
Installations,
Break away Tabs
Figure 1.
2
COOPER LIGHTING SOLUTIONS
9/16" (14.3mm)
Diameter Hole and
Slot
7/8"
4-7/8"
(22mm)
(124mm)
IB500002EN
Installation instructions
Split Washer
Washer
1/2" Bolt
Washer
Figure 2.
Close-Up View
Figure 3.
Line (Black)
White Common
(Black 480V)
Green Ground
Figure 4.
Cover Plate Screws.
Tighten to 20 in-lbs
(2.3N-M)
Figure 5.
1/2" Nut
Center Phillips Head Screw And
Tighten to 20 in-lbs. (2.3N-M)
Black
White
(Black
480V)
Fixture
Green
Ground
Align Cover Tabs
With Arm Slots

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ussl

Table des Matières