This instruction manual must be read carefully and kept for future reference. The instruction manuals of the
other constituents should also be kept.
Assembly must be carried out by adults (minimum two persons) and the preparation and assembly
instructions must be followed. (Assembly should take about half a day, excluding excavation and initial filling.)
IMPORTANT!
Never undertake assembly work in high winds because the sheet metal will be extremely difficult to handle.
Securely tighten all screws and bolts. Unsatisfactory tightening may cause the structure to break.
Handle the vinyl liner with care during assembly, and avoid having objects with sharp, cutting edges nearby.
Do not use a knife to open the box.
We will not be held liable for failure to follow the assembly instructions.
4 - Placing the bottom joint sections and the wall..................................................8
8 - Wintering advice .............................................................................................11
9 - Warranty .........................................................................................................11
1 -
Composition of the pool
One sheet metal wall
One liner, made of PVC
A bag containing rigid upper profiled rods and lower profiled rods (rigid or flexible, depending on model), plus
one or two white vertical flexible profiled rods (depending on model)
Ref.121000
2 -
Tooling and Materials Necessary for Assembly
and Installation
Dia 8 and 10 spanners
Shovel, pick and rake
Flathead screwdrivers
Tape measure
Hacksaw or Stanley knife
- GB -
IMPORTANT
One pack of nuts and bolts (bolts, nuts, washers nut covers)
One pack of junction tubes for rigid pieces (depending on model)
A
B
Ref.121610
Ref.121510
bolt
washer
(not supply with the swimming pool)
Adhesive tape
Cord
Clothes pegs
2 Stakes
Fine sieved sand
C
D
Ref.122591
nut
Cover nut
Level gauge
Groundsheet
Clothespins
Chalk or plaster
7 Notice Réf.880195-9