Initial Start-Up; Handover; Specification; Dimensions And Connections - Stiebel Eltron MHG 35 E Utilisation Et Installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

Initial start-up

11. Initial start-up
Material losses
!
When heating up the natural stone heater for the first
time, observe a maximum heat-up time of 20 minutes.
Then let the panel cool down for at least 60 minutes.
f Perform this process one more time.
f
Note
f In the first two days of use, heat up the natural stone
f
heater step-by-step to the required room tempera-
ture.
This way, you avoid hairline cracks. If hairline cracks do
develop, these are harmless and do not impair the func-
tion or the safety of the natural stone heater.

12. Handover

f Explain the functions of the appliance to the user. Draw spe-
f
cial attention to the safety instructions.
f Hand over the operating and installation instructions to the
f
user.

13. Specification

13.1 Dimensions and connections

a20
a10 Height
a20 Width
b01 Cable entry
i13
Wall mounting brackets
www.stiebel-eltron.com

13.2 Minimum clearances

≥100
70
≥100
MHG, MHJ, MHP, MHS, SPH |
17

Publicité

Table des Matières
loading

Table des Matières