3.
INSTALLATION
This paragraph deals with installation-related arrangements.
Installation and initial commissioning should be carried out by an electrician or professional installer in
accordance with the standards currently in force (for pleasure boats the applicable international standard is
ISO13297).
The installer should familiarize himself with this operating manual and inform users of the instructions for
use and the safety warnings set out in the manual.
The charger is fixed by 4 M5 round screws (diameter of the screw < 10mm in order to allow the opening of
the cover).
Fixing distance: see the corresponding drawing in chapter charger charger overall dimensions.
3.1.
C
HARGER OVERALL DIMENSIONS
3.1.1. CPS3OEM/12-25 charger
Refer to appendix 4.
3.1.2. CPS3OEM/12-40 charger
Refer to appendix 5.
3.1.3. CPS3OEM/12-60 charger
Refer to appendix 6.
3.2.
W
IRING
When connecting or disconnecting a cable, the charger's power supply must be off and the batteries
electrically insulated from the charger.
The references for additional supplies required for the appliance to operate efficiently are provided in the
following paragraphs: failure to comply with these provisions renders the warranty null and void.
3.2.1. Cable from the public AC power supply network or generator
All CPS3 battery chargers can operate automatically and equally on single phase networks from 85 to
265VCA and from 47 to 65Hz.
Generators:
The CRISTEC battery chargers are designed to operate from a generator.
Be careful: In some cases, the generators can produce high over voltages, in particular during
starting phase. Before connecting the charger, please check its compatibility with the characteristics
of the generator: power, voltage, overvoltage, frequency, current... It's highly advised to disconnect
the charger from the AC network during the generator starting phase.
The AC input must be imperatively done on a WAGO connector, type WINSTA, reference 770-103
(not supplied). The charger is equipped with a WAGO terminal, type WINSTA, reference 770-813.
Connect Phase on "L", Neutral on "N" and Earth on the symbol earth. The Earth terminal must be
imperatively connected before any of the other terminals.