Safety Inspection; Assembly And Commissioning; Set Up Guidelines - Nussbaum ATT COMBI LIFT CL 4.40 S Manuel D'exploitation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

• During lifting or lowering, the work area of the lift
should be clear or people.
• The entire lifting and lowering process is to be
continuously observed.
• It is prohibited from moving people with the lift.
• Climbing onto the lift and onto a lifted vehicle is
prohibited.
• Maintenance or repairs on the lift may only be
done once the main switch (7) is off and has
been secured against unauthorized access.
• Maintenance or repairs on the lift may only be
done once the main switch (7) is off and se-
cured, and in addition the operating lever is lo-
cked against unauthorized access.
• After design and maintenance on load bearing
parts the lift must be inspected by a technical
expert.
• It is prohibited to set up a standard lift in explo-
sion endangered workshops and humid spaces
(E.g. washing halls).
• In our plans, we inform of the minimum specifi-
cations for the foundation, however local condi-
tions (e.g. underground, etc.) are outside of our
responsibililty. In case of need, contact an archi-
tect or statics expert.
3.1

Safety inspection

The safety inspection is required to guarantee
operational safety of the lift. It is to be done:
1. Before first commissioning after setting up the
lift
use the "single safety inspection" form
2. After first commissioning, check regularly at
least once per year.
Use the "regular safety inspection" form
3. After changes to the lift system construction
Use the "extraordinary safety inspection" form
! Single and regular safety inspections must be
done by a specialist. It is recommended to do
maintenance at the same time.
20110006 OPI
25.09.2015
COMBI LIFT 4.40 S-S A-S PLUS-S PLUS AMS - HYMAX II 4000 S-S A-S PLUS-S PLUS AMS
i After a change in construction (for example
changing the load carrying capacity or chan-
ging the lifting height) and after significant
maintenance on load carrying parts (e.g. wel-
ding work), inspection by a technical expert is
required (extraordinary safety inspection)
This inspection book contains forms with a detailed
inspection plan for safety inspections.
Please use the appropriate form, record the con-
dition of the inspected system and leave the com-
pleted form in this inspection book.
4

Assembly and commissioning

4.1

Set up guidelines

• Lift set up is done by trained manufacturer perso-
nnel or a contract partner. If the operating com-
pany has appropriately trained assemblers, the
lift can also be set up by them. Set up is to be
done according to the assembly instructions.
• A standard lift may not be set up in explosion
endangered spaces or wash halls.
• Before setting up, verify that there is a sufficient
foundation or make it according to the guidelines
in the foundation plan. The set up location must
be level and even. Foundations in open air and
spaces where winter storms or frost are to be ex-
pected, must have a foundation to frost depth.
• An on-site standard electrical connection of 3
~/N + PE, 400 V, 50 Hz is to be provided.
The supply is to be secured according to VDE
0100 with 16 ampere fuses. The minimum line
cross-section is 2.5 mm².
• To protect the electrical cable all cable condu-
its are to be fitted with cable sleeves or flexible
plastic pipes.
• After successful lift installation and before first
commissioning, the operating company must
have the lift grounding conductors inspected
on-site according to IEC regulation (60364-6-61).
An insulation resistance test is also recommen-
ded.
47

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Att combi lift cl 4.40 s aAtt combi lift cl 4.40 s plusAtt combi lift cl 4.40 s plus amsAtt hymax ii 4000 sAtt hymax ii 4000 s aAtt hymax ii 4000 s plus ... Afficher tout

Table des Matières