ONLY FOR ELT 22 MODELS
i
I
(
)
17, detail 3
Connect the "Cromodream" cable to the ca-
ble coming from the electric wiring box, using a quick release con-
nector (also check the related electrical component diagram).
Plumbing and electrical connections
i
I
(
)
18
Move the shower enclosure close enough to the wall to
enable the connection of the flexible hoses to the outlets provided
in the wall.
FOR ELT 3, 4, AND 22 MODELS ONLY
I
Follow the instructions in the "Electrical Safety" chapter
very carefully.
-Follow the L phase, N neutral and
-Remove the lid of the indicated electric wiring box and, after hav-
ing connected, close the lid carefully and tighten the cable
clamps well, in order to guarantee protection from water jets.
IMPORTANT: for Countries where 220-240V voltage
is supplied by a two-phase system (L+L), the connec-
tion has to be made on terminals L and N anyway.
Connect the main supply cable, coming from the electric network
of the building, to the electric wiring junction box; refer to the elec-
tric wiring diagram of the model provided.
Connection of alarm (if provided)
The ELT3, 4, and 22 models have been designed with an "alarm" pro-
vision (button
). If the building has a "call for help" circuit, it can be
connected to the shower enclosure and controlled by that button.
Inside the electronic control box, near the "ALARM" watertight cable
clamp (see wiring diagram), there are two terminals marked with
"ALL". These terminals correspond to the normally open contacts of a
relay to which the installer can connect the emergency call circuit, which
must comply with current legislation and specific national standards.
When the alarm button is pressed on the display panel, a relay, al-
ready mounted inside the electronic box, activates the emergency
call device for about 15 seconds. The call indicator (bells, buzzers,
lamps, etc.) can be powered either with 220/240V or low voltage,
but with a maximum current absorption of 10 A.
The alarm connection must be made using a cable with specifica-
tions of not less than type H 05 VV-F 2x2.5 mm
The use of this cable is essential to ensure that the cable clamp fit-
ted on the box has the level of protection (waterproofing) required
by regulations.
To guarantee protection against water jets, the cable
clamp of the alarm power supply connection has been
closed with a cap by the manufacturer. This cap must on-
ly be removed if the "ALARM" connection is carried out.
earth symbols.
2
.
13
Completion and checks
FOR ALL MODELS
I
Connect the flexible hose (previously connected to the drainage
column) to the main drain located at floor level
I
If provided, position the sliding top cover (inside the shower tray
enclosure) on top of the shower enclosure.
I
Carry out a complete test cycle of the various functions. Check
that there is no water leaking from the drainage outlet and all the
various hoses (and their connections).
Before the unit is finally placed at the disposal of the user, it is ad-
visable to carry out a demonstration of all the unit's functions in the
presence of the user and to explain the required maintenance
tasks and their frequency.
Fastening the shower enclosure to the wall
i
I
(
)
19, detail 1
Line up the shower enclosure with the corner
of the wall. Unwind the yellow-green earth cables (to be connect-
ed to the inspection panels) located on the back of the wall panel
frame and move them outwards.
i
I
(
)
19, detail 2
Press the shower tray attachment bracket a-
gainst the wall; insert the screws and the washer and tighten them.
i
I
(
)
19, detail 3
Tighten the flexible shower hose to the at-
tachment on the riser rail. Screw the showerhead onto the other end
of the shower hose placiing the filter (A) in between.
i
I
(
20, detail 1
)
Loosen the bracket screw and, with the aid of
a square lined up with the wall, check that the compensator is lined
up with the glass panel upright's profile.
i
I
(
20, detail 2
)
Press the the bracket against the wall and fas-
ten it with the screw provided.
i
I
(
)
20, detail 3
Check that the glass panel upright is vertical.
i
I
(
)
20, detail 4
Tighten the bracket's screw to the shower en-
closure frame.
Installing the inspection panels
i
I
(
)
21, detail 1
Connect the cables to the inspection panels
(found inside the glass panels' packaging) by means of the relevant
tabs.
i
I
(
21, detail 2
)
Insert the inspection panel into the compen-
sator and line it up with the glass panel upright.
i
I
(
21, detail 3
)
Check that the inspection panel is lined up at
the top with the compensator and the glass panels and that it is lined
up with the wall.
i
(
)
1b-2b
.