Assembly - EarthQuake E43 Guide De L'utilisateur

2-cycle earth auger powerheads
Masquer les pouces Voir aussi pour E43:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

ASSEMBLY

TOOLS REQUIRED:
• Two (2) 9/16" Wrenches
ASSEMBLY INSTRUCTIONS: (SEE FIGURE 1)
1. Insert the output shaft of the transmission (A) in the open end of
the Flex Coil ShockTop (B).
2. Line up the bolt holes through the Flex Coil ShockTop and the output
shaft of the transmission.
3. Place the included 3/8-16 x 1.5 inch bolt (C) through the bolt hole.
4. Hand-thread the 3/8-16 nut (D) on the bolt.
5. Using two 9/16 inch wrenches, securely tighten the nut and bolt.
E43 and EA8F shown. Instructions also apply to EA6F and EA10F
augers.
6. Hand thread fishtail point (E) in bottom open end of auger stem (F)
if not already installed.
8
Figure 1 - One Man Model Shown
DO NOT REFUEL WHILE SMOKING, NEAR OPEN FLAME,
OR OTHER POTENTIAL HAZARDS.
FUEL IS HIGHLY FLAMMABLE AND MUST BE HANDLED
WITH CARE. NEVER FILL THE TANK WHEN THE ENGINE
IS HOT OR RUNNING. ALWAYS MOVE OUTDOORS TO
FILL THE TANK.
Check for parts online at www.getearthquake.com or call 800-345-6007 M-F 8-5
2-Cycle Earth Auger Powerhead
C
WARNING
Operator's Manual
A
D
B
F
E

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

35257

Table des Matières