Putting Into Operation - Binzel BRS LCi Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

BRS LCi PLC

6 Putting into operation

DANGER
Risk of injury due to unexpected start
The following instructions must be adhered to during all maintenance, servicing, assembly, disassembly, and repair work:
• Switch off the power source.
• Close the compressed air supply.
• Disconnect all electrical connections.
NOTICE
• Note the following instructions:
 2 Safety on page EN-4
• Only qualified personnel are permitted to perform work on the device or system.
• Make sure that the cleaning process is not impaired by the collecting tray and the bottle holder.
1
Position 1
2
Clamping position P2
3
Position 3
Fig. 7
Putting into operation
BAL.0424.0 • 2019-04-23
1
7
6
5
4
4
Motor clamp
5
Lowest position (stroke down)
2
6
Distance sleeve
7
Gas nozzle
6 Putting into operation
3
EN - 13

Publicité

Table des Matières
loading

Table des Matières